Project Management Engineer specialized in Photovoltaic Power Generation and Power Substations, as well as in the electrical design and implementation of building infrastructure, professional focus lies in planning, executing, and overseeing projects related to solar photovoltaic energy generation, electrical substation infrastructure, and the integration of electrical systems into buildings
As Project Engineer specializing in Substations and Supervision, I have amassed extensive experience in management and administration. Responsibilities have encompassed wide range of tasks, from drafting terms of reference for tenders in Tamanique Substation to leading coordination efforts for commissioning and energization of Morazán Substation. Among duties, I have been instrumental in drafting requirements and memoranda for procuring essential equipment and supplies, as well as managing approval process for these items. Additionally, have diligently prepared progress reports and coordinated technical staff, ensuring successful completion of electromechanical assembly, testing, and commissioning works. Throughout all project phases, have provided valuable technical expertise to ensure precise execution of designs and specifications. I have meticulously maintained records for each project and engineering discipline, while also overseeing installation of materials and equipment to ensure compliance with drawings and specifications. Furthermore, I have consistently delivered construction tasks within budget, while prioritizing safe working conditions and meeting project deadlines.
Coordination and planning of electrical personnel management for electrical construction projects, including budget development for materials and preparation of bids for tender. Proficient in low-voltage electrical designs. Experienced Resident Engineer in photovoltaic generation projects, overseeing construction of 5.8 MW solar park at American Park. Additionally, involved in electrical construction of 115 kV power substation at Capella Solar Jiquilisco, including 125 MVA power transformer. Contributed to construction of 115 kV line interconnection bay at ETESAL substation in Ozatlan, Usulután, and the construction of a 46 kV electrical substation in Armenia, Sonsonate, with 5 MVA electrical power injection capability.
As Engineering Supervisor specializing in construction, design, and maintenance of electrical systems, ensure strict adherence to established rules, laws, and regulations. Primary responsibilities include coordinating, managing, and planning the supervision of electrical personnel for projects involving low voltage electrical constructions, substations, and industrial electrical installations. Projects under supervision have included the electrical construction of Maxi Despensa Ahuachapán and Maxi Despensa San Vicente, as well as the remodeling of Super Selectos Masferrer, Super Selectos Miravalle 2, Despensa de Don Juan Ayutuxtepeque, Super Selectos Metro Centro Santa Ana, and Super Selectos Sonsonate II. Additionally, possess strong skills in budgeting and bidding for materials. Also oversee the coordination and scheduling of connection and disconnection maneuvers for substations and main distribution panels in buildings undergoing renovation. Expertise extends to encompass industrial safety standards and occupational health procedures.
• Proficiency in Project Formulation and Administration based on PMI standards.
• Conducted audits on buildings related to energy efficiency.
• Specialization in power systems.
• Occupational Health and Safety training provided by Operadora del Sur, S.A. de C.V.
• Budgeting for electrical materials in construction projects.
• Basic knowledge of power substation automation.
• Earned Value Methodology applied to MS Project.
• National Electrical Code NFPA 70 familiarity.
• Familiarity with General Construction Standards for Distribution Networks and Aerial Line Construction Standards for Electrical Distribution in El Salvador Agreement 66-E-2001.
• Operational understanding and basic knowledge of distribution and transmission equipment.
• General knowledge of construction materials for distribution and transmission networks for electrical energy.
Eng. Luis Fajardo, Project Coordinator, Organization of Ibero-American States, 2132-1717, lfajardo@oei.org.sv,
Eng. Williams Polio, Project Supervisor, Energia Electrica SA de CV, 74359127, williamspolio@yahoo.com,
Eng. Jairo Aaron Vigil Sanchez, Water Technology Manager, Ingenio el Angel, 7325-3237, Jairo.vigil@ingenioelangel.com.sv,
Eng. Christopher Ernesto Cañas Hurtado, Computer Developer, Autofacil, S.A. de C.V., 7681 6778,NETO.BARCA2@gmail.com,
Eng. Johan Joseph Anuvis Azucena Ramirez, Substation Engineer, project management, LAGEO, 77414695, jhoan_azucena@hotmail.com