Juan José Cruz Aguilar

Juan José Cruz Aguilar

Civil Engineer
Santa Tecla,La Libertad

Summary

Experienced leader with strong background in guiding teams, managing complex projects, and achieving strategic objectives. Excels in developing efficient processes, ensuring high standards, and aligning efforts with organizational goals. Known for collaborative approach and commitment to excellence.



Experienced with performing routine and emergency maintenance on various equipment and systems. Utilizes troubleshooting skills to diagnose and repair issues efficiently, ensuring minimal downtime. Track record of maintaining safety standards while completing tasks promptly and accurately.

Overview

31
31
years of professional experience
2
2
years of post-secondary education

Work History

OPERATION´S CONTRACTOR

PUMA ENERGY EL SALVADOR SA DE CV
09.2024 - Current
  • Handled sensitive information with discretion while maintaining strict confidentiality in compliance with company policies and legal requirements.
  • Exceeded performance metrics consistently by staying organized, managing multiple priorities simultaneously, without sacrificing the quality of work delivered.
  • Maintained organized records of all transactions, ensuring easy access to information when needed for audits or reporting purposes.
  • Input data into spreadsheets and databases.
  • Engaged with customers to effectively build rapport and lasting relationships.
  • Accurately processed P.O. And price estimates.terior finishesrice estimates.
  • Improved project efficiency by assisting in the development and implementation of civil engineering plans and designs.
  • Successfully completed large-scale infrastructure projects using advanced civil engineering concepts, while maintaining strict budgetary constraints.
  • Promoted eco-friendly practices in civil engineering projects, resulting in a positive environmental impact.
  • Contributed to successful proposal submissions for new business opportunities by providing technical input on civil engineering aspects during the bid preparation process.
  • Improved project efficiency by implementing innovative civil engineering solutions, and streamlining processes.
  • Demonstrated adaptability to various industry sectors by working on drafting projects ranging from architecture to civil engineering.


Projects done for the Operations Department.

  • Remodeling the gas station (gas and water supply for every pump: Shell, Bosques del Río). 2025
  • Remodeling the pump bay and protecting it with bollards. 2025 at Shell, Usulutan.

MAINTENANCE CONTRACTOR

Puma Energy El Salvador
11.2023 - Current
  • Maintenance Contractor for the Main Building in Santa Tecla, working for the Maintenance Department and the Projects Department.

Responsabilities:

Roof maintenance, plumbing, painting, furniture maintenance, carpentry, window panes, flooring, electrical maintenance, and a new electrical network. For 59 convenience stores at gas stations.

Roof maintenance involves regular inspections, cleaning, and minor repairs to ensure a roof's longevity and functionality. It includes tasks like removing debris, cleaning gutters, trimming branches, and addressing leaks or damage promptly.

  • Installation of electrical systems for two kitchen equipment items in 28 service stations (November 2024).
  • Followed the routine maintenance checklist.
  • Performed minor wall repair, installed drywall, and applied wallpaper.
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Reviewed technical documentation to complete equipment maintenance and repair.
  • Checked for storm damage around the property and contacted the supervisor with findings.
  • Developed customized preventive maintenance programs tailored to the specific needs of each client's facilities.
  • Established strong relationships with clients through consistent communication and responsiveness to their needs.
  • Ensured compliance with local regulations by keeping up to date on changes in codes, permits, and inspection requirements.
  • Managed renovation projects from start to finish, ensuring on-time completion within budget constraints.
  • Maintained accurate records of completed work orders, service requests, and inventory levels for efficient reporting purposes.
  • Followed work orders and specifications for machine and equipment replacement, repair, or maintenance.
  • Assisted clients in developing emergency response protocols for unforeseen events, such as natural disasters or equipment failures.
  • Used problem-solving skills to alleviate issues efficiently, with minimal supervision.
  • Maximized performance by monitoring daily activities, and mentoring team members.
  • Enhanced customer satisfaction by resolving disputes promptly, maintaining open lines of communication, and ensuring high-quality service delivery.
  • Controlled costs to keep the business operating within budget, and increase profits.
  • Developed and maintained relationships with customers and suppliers through account development.
  • Improved safety procedures create safe working conditions for workers.
  • Maintained positive customer relations by addressing problems head-on, and implementing successful corrective actions.
  • Established team priorities, maintained schedules, and monitored performance.

Maintenance projects executed.

  • Ceiling slab impermeabilization, with a cover of an asphalt screen, 1,277.49 sqm, P.O. Amount: $137,000 USD (March – July 2025)
  • Construction of a metal fence for a gas station. Shell Sonsonate. (June 2025)
  • Remodeling the Shell gas station in Usulután (June - July 2025).
  • Remodeling the Shell gas station at Bosques del Río (July - August 2025).
  • Electrical project for kitchen renovation in 17 gas station Super 7 convenience stores. July – August 2025.
  • Metal grids for convenience stores. June 2024.
  • Corrective maintenance plan for convenience stores, Shell El Pedregal, Shell Los Héroes, and Shell Vía del Mar. November 2024.
  • Solving the filtration issue on the second floor of the main building. Exploration and repair of sheetrock, May 2025.
  • Fabrication of the technical floor sections in the main building, 2024.
  • Gardening contract for the main building and the training center. March 2025.
  • Maintenance of gas stations: painting, concrete restorations, and metal protection for the pumps. November 2023 to the present.

REFURBISHMENT CONTRACTOR

MARKETING SUPPORT S.A. DE C.V.
02.2019 - Current
  • Renovation of the building located in Residencial Decápolis. 2022
  • Renovation of the main office's location: Colonia Escalón, San Salvador. 2023
  • Assistance for stadium events, transportation, and stands construction. 2024.
  • Residential renovation for executives and gardening. 2023
  • Doors renovations October 2023.

METAL MECHANIC CONTRACTOR

PREFABRICADOS INTERNACIONALES S.A. DE C.V.
05.2017 - Current
  • Fabrication of gates for Freund Ltd. Santa Ana. 2018.
  • Fabrication of emergency doors for YKK Industry 2017.
  • Fabrication of emergency doors for Export Salva Free Zone 2009.
  • Fabrication of main and emergency doors for Almacenes Vidri, S.A. de C.V. 2010
  • Fabrication of main and emergency doors for Super Selectos warehouse in La Nueta (Airport)
  • Fabrication of gates and doors for Totto in Plan de La Laguna. 2015.


Maintenance Contractor

DESCO, S.A. DE C.V.
02.2017 - Current
  • House renovation for José Gonzalo. Doors renovation, floor, ceiling fan, bathroom, laundry area, electrical network, bedroom: $10,917.13 USD.
  • Ceiling, roofing, and walls renovation at Building #460 Aeroman offices.
  • Doors restoration at Aeroman president's office. Building #460, Boulevard Santa Elena.
  • Roof cleaning at Building #460, Santa Elena.
  • Helicopter hangar roofing maintenance.

PROJECT DEPARTMENT´S CONTRACTOR

CENTROAMERICA COMERCIAL S.A. DE C.V.
05.2015 - Current
  • Maintenance for 25 stores and the main building, February 2015, to the current day.


  • Authorized tree felling of 101 trees in 10,000 square feet. 2020.


  • Construction of II-level floor mezzanines in Dollarcity, Árbol de la Paz, San José, San Martín Centro.


  • Construction of a terrace for employees' resting and lunch area, 600 m². April 2022.


Santa Elena I Tower, 2023–2024


  • Construction with sheetrock offices level I (ceiling fan, walls, bathrooms, columns, kitchen).
  • Construction of sheetrock offices, level II (ceiling fans, walls, bathrooms, kitchen).
  • Construction of sheetrock offices, level III (ceiling fans, walls, bathrooms, kitchen).
  • Electrical network for basement level I.
  • Electrical network for basement level II.
  • Electrical network for basement level III.
  • Electrical network for basement level IV.
  • Terrace cladding with sheetrock is 17 meters high, from levels I to 8.
  • Construction of 189 sq. m. Chain-link perimeter fence.


Adequate warehouse for new stores for Dollar City, El Salvador.

  • Dollarcity, El Encuentro, San Martín, year 2021.
  • Dollarcity, San Miguel, Panamericana, year 2024.
  • Dollarcity, El Encuentro, Zacatecoluca, May 2025.
  • Dollarcity, Sonzacate, July 2025.
  • Dollarcity, Las Ramblas, San Miguel, August 2025.

Contractor Project Manager

Distribuidora Eléctrica DELSUR, S.A. De C.V.
02.2006 - Current
  • Contract GAF 187-07, Preventive and Corrective Maintenance at 13 customers' attention offices, 18 electrical substations, main building levels I, II, and III. ( February 2005 until 2025) $180,000 USD yearly.
  • Remodeling of Delsur Zacatecoluca, customer´s attention office. $32,388 USD (2011)
  • Design, construction and habilitation of access with TEKA wood and TOBA LÍTICA (natural stone) at a 12ml high. (August - october 2007)
  • Renovation of DELSUR ROSARIO DE LA PAZ, (November 2007), $29,800.00 USD.
  • Renovation of the system's controlling network nationwide (February 2008): $19,800.00 USD.
  • Renovation of the Unity of Measures: 240 sq. m. (February 2008)
  • Construction of Area for Transformer Workshop (200 m²). (August 2009)
  • Construction of Control Booth and Base for Transformer at Substation Sub South.
  • Design and construction of a freight elevator in the central warehouse. (August 2010)
  • Construction of Control Booth at Substation Sub Santo Tomás. (November 2010)
  • Construction of control booth, transformer’s concrete bases, and inspection wells at electrical substation 'La Nueta' (Jan 2011).
  • Topography and land leveling at the employee's soccer field. 2,500 sq. ft.
  • Gardening and grass installation at the soccer field, 2,500 sq. ft.
  • Installation of paving stones with grass, 400 sq. m. In the technical school area.
  • Construction of Expansion of Control Booth at Substation Sub Ateos.
  • Construcción de Contra fuerte a Muros en dos Costados de Subestación Sub Masajapa
  • Diseño y Reconstrucción de Muro y Talud en Costado Norte de Parqueo La Ceiba Dañado por Tormenta Amanda (900 m2) (Junio 2020)
  • Instalación de Techos Insulados en 12 Subestaciones (Julio 2022)
  • Remodelación de módulo 4 (300 m2) (Noviembre 2022)
  • Remodelación en Área de Compras Edificio Corporativo (Junio 2023)
  • Construcción de Rampas Entre Pasillos de Módulos en Plantel Central (Agosto 2023)
  • Construcción de base para postes en Sub El Volcán (Noviembre 2023)
  • Construcción de bodegas en 6 Subestaciones Quezaltepeque, Sitio del Niño, Masajapa, Lourdes, Ateos y Monserrat (Junio 2024)
  • Remodelación de Unidades de Eléctrika e Innova (250 m2) (Octubre 2024)
  • Delivered projects on time and within budget by effectively managing schedules, risks, and quality control measures.
  • Fostered strong relationships with subcontractors, ensuring timely delivery of materials and services for project success.
  • Improved project efficiency by streamlining communication and implementing innovative project management tools.
  • Secured new business opportunities by delivering high-quality work that exceeded client expectations consistently.
  • Reduced project costs through diligent monitoring of resources and close collaboration with customers.
  • Recruited and oversaw personnel to achieve performance and quality targets.

Construction Manager

INVERSIONES CRUZ ARÉVALO, S.A. DE C.V.
01.2006 - Current
  • Identified and resolved construction issues promptly to prevent delays.
  • Monitored daily progress on-site to maintain a clear understanding of challenges faced by the team members or any required adjustments in plans or schedules.
  • Monitored subcontractor operations and applied effective time, resource, and money management strategies to delivery under-budget project completion.
  • Communicated daily with vendors to keep project fully operational.
  • Verified completed projects met approved time, quality, and cost estimates.
  • Supervised a team of 28 construction workers to maintain productivity, interior and exterior finishes, and quality of work.
  • Oversaw successful completion of multiple projects simultaneously, prioritizing tasks based on urgency and importance.
  • Enhanced project delivery timelines by efficiently coordinating construction phases and resource allocation.
  • Obtained building and specialty permits from local jurisdictional agencies.
  • In charge of develop and fullfil contractor´s contracts and project for every customers: Puma Energy, American Industrial Park, Delsur, Campys, Markting Support, Dollarcity Guatemala, Dollarcity or Centroamerica Comercial El Salvador, Parque Industrial El Progreso, ITCA, Desco and Residentials customers.

Metal Mechanic and Interior and Exterior Finishes

Constructora NABLA, S.A. DE C.V.
07.2023 - 06.2024
  • Sheetrock for offices in Torre Santa Elena I, 2,350 sqm.
  • Painting finishing for presidential offices and managers' offices.
  • Reinforcement for cabinets in bathrooms and kitchens. Levels I, II, III, IV, and V.
  • Seal of columns and beams at Level III.
  • Construction of Metal structure for roofing at level VIII.
  • Metal structure construction for the main entrance.
  • Metal structure construction for supporting glasses at levels I, II, III, IV, V, VI, VII, VIII at Torre Santa Elena.
  • Finishing of Bodyguards resting area at "la Casona" Santa Elena.
  • Construction of rainwater collection pits. 35 ml.
  • Construction of Electrical subestation for "La Casona"
  • Mitigation of rainwater filtration in "La Casona"

Maintenance Technician Contractor

DOLLARCITY GUATEMALA
01.2018 - 02.2023
  • Painting and renovation of the Michatoya Industrial Park warehouse. 1,200 sqm (March 2018)
  • Maintenance services: carpenter, painting, glass, ceiling, floor, at: Petapa, Jutiapa, Guatemala City, Torre Reformador. 2018-2022.
  • Dollarcity Tivoli.
  • Dollarcity Petapa.
  • Dollarcity Jutiapa.
  • Dollarcity Chiquimula.
  • Dollarcity Escuintla.
  • Dollarcity Próceres.
  • Dollarcity Periférico.
  • Dollarcity Reformador.
  • Dollarcity Pradera Zacapa

Contractor

FERTICA EL SALVADOR, S.A. DE C.V.
01.2015 - 02.2018
  • Completed complex metallic fabrication projects with precision, ensuring the final product met client specifications.
  • Developed an industrial warehouse, qualifying the infrastructure to withstand sulfates and fertilizers.
  • Achieved consistent weld quality through careful preparation of materials and attention to detail during execution, improving welding quality by performing precise cuts, bevels, and welds on various metals.
  • Renovated pillars and beams of industrial warehouse which had been corroded by time and chemicals in the environment.

CONTRACTOR

INSTITUTO TECNICO CENTROAMERICANO
07.2017 - 01.2018
  • Roofing restoration and lifting with beams at the main building at Santa Ana offices. (August - November 2017)
  • Painting renovation at Building A at Santa Tecla offices.
  • Maintenance at the main offices in Santa Tecla: painting, doors, garage, ceiling fan, and floor. (July 2017)

METAL MECHANIC CONTRACTOR

PARQUE INDUSTRIAL EL PROGRESO
01.1997 - 02.2011
  • Construction of mezzanine at Warehouse 1.
  • Construction of mezzanine at Warehouse 2.
  • Construction of the mezzanine at Warehouse 3.
  • Construction of a mezzanine at Warehouse 4.
  • Construction of mezzanine at Warehouse 5.
  • Garage and doors for warehouses 1, 2, 3, 4, and 5.

Contractor

American Industrial Park SA De CV
01.1995 - 06.2009
  • In charge of the project execution in the construction of metal mechanics for the warehouse in free zone I and II stage (1995 until 2009). Every warehouse is 1,200 sq. m.


  • Construction of a supporting wall for offices, cafeterias, machine rooms, and air-conditioned bases on the upper roof, Blocks A, B, C, D, E, F, G, and H.
  • Fabrication of a metal tank for the treatment of the wastewater plant (January – March 1996).
  • Fabrication of a 300 m² metal structure for the cafeteria of Block 'A'. (1997)
  • Fabrication of an open-core structure of 450 m² and 6.50 m in height for warehouse Block 'B'. (August – October 1996)
  • Fabrication of a metal structure for administrative offices of the industrial warehouse in Block 'C', in an area of 250 m² and 5.00 m in height. (January – June 1997)
  • Fabrication of a metal structure for administrative offices of the industrial warehouse in Block 'D', in an area of 300 m² and 5.00 m in height. (July – November 1997)
  • Fabrication of a metal structure for administrative offices of the industrial warehouse in Block 'E', in an area of 300 m² and 5.00 m in height. (January – June 1998)
  • Fabrication of a metal structure for administrative offices, cafeteria, and machine room of industrial building Block 'F', in an area of 600 m² and 6.00 m in height. (January – June 1999)
  • Fabrication of Structure for Offices in Distribution Centers in an Area of 250 m². (July – November 1999)
  • Fabrication of the whole structure and metal mechanic bases for offices. Area: 600 sq. ft.


  • Fabrication of the bases and ceiling structure for the machine room for the industrial warehouse, Block I. (January to June 2000)


  • Fabrication of 1,000 sq. m. For the machine room for the warehouse block H (January to June 2002).


  • Fabrication of bases, walls, and ceiling for the cafeteria warehouse at block H, 600 sq. m. (January – June 2002)


  • Fabrication of structure for Puma store and gas station – American Park in an area of 600 m². (March – June 2004)


  • Fabrication of Structure for 2-Story Building in an area of 800 m², Access Stairs, and Emergency Ramps. Planta Maya. (June – September 2004)


  • Fabrication of Metal Structure for Warehouse, Machine Room, of Block 'E' and 'G' in an area of 2,500 m². (September 2007 – February 2008)


  • Kept site work safe and in line with budget, schedule, and applicable building codes. (June 2009)

Maintenance Contractor

COMISIÓN EJECUTIVA PUERTUARIA, CEPA EL SALVADOR
02.2002 - 03.2003
  • Disassembly of warehouse at seaport in Acajutla. 2700 sqm.
  • Construction of panels for office divisions with sheetrock in main office. 240 sqm.



Education

GRADUATED IN THEOLOGY - Theological Studies

GOD´S ASSEMBLY BIBLICAL INSTITUTE ANEXO JOSUE
COLONIA CAMPESTRE SAN SALVADOR, EL SALVADOR
05.2001 -

MASTER OF DIVINITY - Theological Studies

SUM BIBLLE COLLEGE & THEOLOGICAL SEMINARY
El Dorado Hills, CA
08.2023 - Current

AD HONOREM TEACHER FOR HIGH SCHOOL AT -

FOVACE CENTRO ESCOLAR JOSE MARTI
SAN SALVADOR
05.2001 -

SAFETY, HEALTH AND WELFARE AT WORK (CONSTRUCTION) - Civil Engineering

CACECSISO, S.A. De C.V.
San Salvador, SS
05.2001 -

FIRST AID COURSE - Occupational Health And Safety

SALVADOREAN RED CROSS
SANTA TECLA, LA LIBERTAD
05.2001 -

ARCHITECTURAL PAINTING AND DESIGN - Civil Engineering

SHERWIN WILLIAMS PAINTING ACADEMY
Ilopango, El Salvador
05.2001 -

ARCHITECTURAL DRAWING SOFTWARE - Computer Engineering

INSTITUTO TÉCNICO CENTROAMERICANO
SANTA TECLA, LA LIBERTAD
05.2001 -

BACHELLOR OS SCIENCE IN CIVIL ENGINEERING - CIVIL ENGINEERING

UNIVERSIDAD TÉCNICA LATINOAMERICANA
Santa Tecla, La Libertad
05.2001 -

High School Diploma -

INSTITUTO TÉCNICO EXSAL,
San Salvador, El Salvador
05.2001 -

Skills

Problem-solving

References

  • Architect José Luís, Valle Flamenco,

     Phone Number +503 7852-7698,  

     Company: American Industrial Park, Free Zone


  • Lawyer & Client Gilberto Rivera

     +503 75966582

     Chief of the Supreme Court of El Salvador, San Salvador.


  • Architect Jorge Montes

   +503 78622087

    Projects Manager 

    Centroamerica Comercial, S.A. de C.V. 

    Dollarcity El Salvador.


  • Eng. Alex Luna

   +503 77472995

    Regional Maintenance Sr. Lead

    Centroamerica Comercial, S.A. de C.V.


  • Pastor Nahúm Ashtul Campos Marquez

    +503 79750711

     New Life Church San Salvador. 

Languages

Spanish
Advanced (C1)
English

Timeline

OPERATION´S CONTRACTOR

PUMA ENERGY EL SALVADOR SA DE CV
09.2024 - Current

MAINTENANCE CONTRACTOR

Puma Energy El Salvador
11.2023 - Current

MASTER OF DIVINITY - Theological Studies

SUM BIBLLE COLLEGE & THEOLOGICAL SEMINARY
08.2023 - Current

Metal Mechanic and Interior and Exterior Finishes

Constructora NABLA, S.A. DE C.V.
07.2023 - 06.2024

REFURBISHMENT CONTRACTOR

MARKETING SUPPORT S.A. DE C.V.
02.2019 - Current

Maintenance Technician Contractor

DOLLARCITY GUATEMALA
01.2018 - 02.2023

CONTRACTOR

INSTITUTO TECNICO CENTROAMERICANO
07.2017 - 01.2018

METAL MECHANIC CONTRACTOR

PREFABRICADOS INTERNACIONALES S.A. DE C.V.
05.2017 - Current

Maintenance Contractor

DESCO, S.A. DE C.V.
02.2017 - Current

PROJECT DEPARTMENT´S CONTRACTOR

CENTROAMERICA COMERCIAL S.A. DE C.V.
05.2015 - Current

Contractor

FERTICA EL SALVADOR, S.A. DE C.V.
01.2015 - 02.2018

Contractor Project Manager

Distribuidora Eléctrica DELSUR, S.A. De C.V.
02.2006 - Current

Construction Manager

INVERSIONES CRUZ ARÉVALO, S.A. DE C.V.
01.2006 - Current

Maintenance Contractor

COMISIÓN EJECUTIVA PUERTUARIA, CEPA EL SALVADOR
02.2002 - 03.2003

GRADUATED IN THEOLOGY - Theological Studies

GOD´S ASSEMBLY BIBLICAL INSTITUTE ANEXO JOSUE
05.2001 -

AD HONOREM TEACHER FOR HIGH SCHOOL AT -

FOVACE CENTRO ESCOLAR JOSE MARTI
05.2001 -

SAFETY, HEALTH AND WELFARE AT WORK (CONSTRUCTION) - Civil Engineering

CACECSISO, S.A. De C.V.
05.2001 -

FIRST AID COURSE - Occupational Health And Safety

SALVADOREAN RED CROSS
05.2001 -

ARCHITECTURAL PAINTING AND DESIGN - Civil Engineering

SHERWIN WILLIAMS PAINTING ACADEMY
05.2001 -

ARCHITECTURAL DRAWING SOFTWARE - Computer Engineering

INSTITUTO TÉCNICO CENTROAMERICANO
05.2001 -

BACHELLOR OS SCIENCE IN CIVIL ENGINEERING - CIVIL ENGINEERING

UNIVERSIDAD TÉCNICA LATINOAMERICANA
05.2001 -

High School Diploma -

INSTITUTO TÉCNICO EXSAL,
05.2001 -

METAL MECHANIC CONTRACTOR

PARQUE INDUSTRIAL EL PROGRESO
01.1997 - 02.2011

Contractor

American Industrial Park SA De CV
01.1995 - 06.2009
Juan José Cruz AguilarCivil Engineer